Task
A new urban quarter is being planned in Weimar, the so-called Bahnstadt. yverkehrsplanung GmbH examined the traffic planning and traffic engineering assessment of the connection to this area. The challenge was to handle the volume of traffic in an integrated location to an already highly congested traffic system with acceptable traffic quality.
Work steps
The following steps were implemented:
- Implementation and evaluation of video-based node current surveys,
- Estimation of trip distribution,
- Determination of trip generation and mode choice as well as the temporal distribution of traffic volume,
- Proof of performance based on microscopic simulations, taking into account the mutual influence of neighboring nodes,
- Development of a mobility concept for a sustainable influence on the choice of means of transportation.
Results
The following results are available:
- Traffic volumes for traffic forecast with node flow plans
- Proof of performance of the nodes for peak hours
- Dimensioning proposals for the nodes and internal traffic development,
- Basic data for acoustic investigations,
- a mobility concept.
An overall traffic planning and traffic engineering assessment of the project was carried out.
Client
City of Weimar, Zehentner + Seidel
To the homepage
Project period
2023 - 2024
Population
65.000
Area of investigation
Weimar