Traffic study Eichsfeldklinikum Heiligenstadt

Traffic study on the connection to the Eichsfeldklinikum Heiligenstadt

Task

In Heilbad Heiligenstadt, yverkehrsplanung GmbH prepared a traffic planning and traffic engineering assessment of the connection to the future Eichfeldklinikum on the basis of the detailed utilization concept.

Work steps

The project comprised the following steps:

  • Implementation and evaluation of video-based junction flow surveys in the course of the L 1005,
  • Comparison of the data with the Thuringia traffic model,
  • Determination of trip generation and mode choice as well as the temporal distribution of the hospital’s traffic volume,
  • Proof of performance of the connection to the public road network.

Results

The results of the investigation are as follows:

  • traffic volume structure differentiated by time,
  • Performance analyses of the junctions for the peak hours,
  • Determination of parking space occupancy,
  • Overall assessment of the project in terms of traffic planning and traffic engineering.

Client
Engineering consultancy W. Gries GmbH Heilbad Heiligenstadt

To the homepage
(opens in a new tab)

Project period
2023

Population
approx. 19,000

Area of investigation
Heilbad Heiligenstadt